Xinxiang City Zhenyuan Machinery Co., Ltd. Mining vibrating screen mainly used in metallurgy, mining, coal, building materials, electric power, chemical industry, metallurgical industry, especially The most widely used is the blast furnace, the coking plant, concentrator commonly used screening machinery. Our mining vibrating screen processing capacity, technical parameters and reasonable, serialization,smooth and reliable operation, low noise, easy maintenance and overhaul.
2013年7月29日星期一
How do aggregates production line equipment prepared before operation
Aggregate production line high degree of automation, low running costs, crushing equipment rate, energy saving, large output, less pollution, easy maintenance, to produce sand meet the
national standard construction sand, particle size were, uniform grain shape is good, with reasonable level. However, in a good machine in the boot before running a very
important job is running before the inspection. How do today introduced aggregate production line equipment operation preparatory work before.
First, you should check aggregates production line equipment lubricant tube is connected securely, pre-commissioning should be re-added once the oil, add Mobilube lubrication
premium or 3 # lithium grease; checking aggregates production line equipment, motor wiring is correct, voltage is normal ( normal voltage 380 V); Check the component connection,
should be solid and reliable, carefully check the impeller for foreign objects, if any should be excluded. Furthermore belt is installed before you start the motor rotation
direction signs should be consistent with the Screening machine (ie from the feed port to see the impeller rotates counterclockwise) if the signs in the opposite direction, the motor
wiring should be adjusted so that rotation and signs in the same direction, and never allow rotating in opposite directions; For dual motor drive, spindle assembly with both
sides of the motor, respectively, with the same number of triangle belt and spindle assembly is connected to both sides of the triangle belt tensioning and should be adjusted to
the same straight . Final. After checking, the transfer of stone production line equipment before the first stone production line equipment empty load and load test, the test
confirmed that no problem and then handed over production.