Roll-on roll crusher installation adjustment and commissioning

The roll crusher (double roll crusher) installation adjustment introduce

(A) the installation and adjustment of the machine
Refer to the instructions accompanying the use of units of foundation plans, construction plans design basis, the machine securely mounted in a specially designed on the basis,

in order to better withstand the machine at work arising from the uneven force, the chassis can be placed under the wooden Semi-mobile crushing plant sleepers of the sleepers of the entire machine and

fit, and stay

The discharge location.
The machine is supplied as a complete assembly, but must be carefully checked during transport or during storage long time, the machine without damage, and lubricate the sliding

parts part without corrosion. Determine the machine intact before installation.
Machine installation, and then identify the horizontal and is rotated by drawing the part of the installation, the elastic belt should be adjusted to an appropriate position,

the compression spring must be adjusted to the appropriate location.
After installing all the more stringent checks each fastening portion without loosening.
(Two) of the machine commissioning:
After installing the machine, put into production, you must make a trial run.
A dry run test
Machines in use of the site and must be not less than 2 hours of continuous empty running tests. Operation bearing temperature must not exceed 30 ℃, the maximum temperature not

greater than 40 ℃, gears, long gears, pulleys and roll triangle and some other rotation should be smooth, no unusual noise, rollers are not permitted to touch

Hit.
2, the load test:
In the empty running test to achieve a good basis in order to carry the load running test, load test time shall not be less than 8 hours (to continuous operation).
Determination of the particle size and the actual production meets the requirements, and to ensure that the bearing temperature rise should not exceed 35 ℃, coal screening machine should be

smooth and should not have a more severe vibration, the fasteners should be solid. Lubrication points must be filled with grease. Should be well sealed, no leakage.
Found when running production or granularity does not meet the requirements, you can use active device to adjust the rear adjustment screw, if found running current fluctuation

is unstable, check the feed size to meet the requirements, can be put into normal load test production use.